PlanM Solutions has partnered with OSInnovation (OSI) to supply certified welding-free support channels, vibration-proof smart fasteners, and UL-certified sway brace systems. Designed to eliminate hot-work fire hazards, preserve coating integrity, and reduce installation time by up to 70% across Data Centers, Semiconductor Plants, LNG, and Offshore facilities.
A global pioneer in engineered steel outfitting and modular support systems, dedicated to industrial safety and structural integrity.
Founded in 2011, OSI is a steel outfitting and support solutions company serving both offshore and onshore industries. OSI supplies a wide range of engineered products—from individual components to fully integrated support welding-free systems—designed to improve safety, installation efficiency, and schedule reliability across LNG, petrochemical, power, semiconductor, and data-center facilities.
HQ & Engineering
Central hub for structural analysis, engineering design review, and international client project coordination.
Production & Assembly
Equipped with specialized roll-forming lines, automated stamping, and modular pre-assembly facilities.
Conventional hot-work welding on support frames and piping has caused catastrophic multi-million dollar fires and explosions in high-tech and energy facilities.
Incident Case 1: Data Center
| Target Work | Support frames / equipment racks |
|---|---|
| Root Cause | Welding sparks ignited nearby combustible materials |
| Financial Loss | USD 1โ5 Million (construction delay, rework) |
Incident Case 2: Energy Terminal
| Target Work | Structural piping & support area |
|---|---|
| Root Cause | Welding sparks ignited residual flammable vapors |
| Financial Loss | USD 100M+ (7 injured, shutdown, remediation) |
| Evaluation Criteria | Conventional Field Welding | OSI Welding-Free System (Cold Work) |
|---|---|---|
| Fire & Explosion Safety | Extremely High Risk (open flames, sparks, hot slag) | 100% Spark-Free Cold Work (Safe for operating facilities) |
| Permits & Fire Watch | Mandatory daily hot-work permits & fire watch labor | No hot-work permits or fire watchers required |
| Installation Speed & Labor | Slow; relies on certified skilled welders and multi-step prep | Up to 70% Faster; rapid bolt-on with standard hand tools |
| Corrosion Protection Coating | Thermal burns destroy zinc/galvanized layer; causes rust | Factory HDG / Stainless coatings remain 100% intact |
| Flexibility & Modifications | Rigid and permanent; requires torch-cutting to relocate | Modular & 100% Reusable; effortlessly adjustable position |
Pre-engineered, standardized, and internationally certified steel outfitting components for mission-critical installations.
Heavy-duty steel channel support systems precision roll-formed for offshore, marine, and mission-critical onshore piping without hot-work welding. Certified by DNV for maritime classification requirements.
Patented single-operator locking smart fastener engineered for rapid, bolt-on channel attachment with guaranteed pull-out and shear strength. Resistant to continuous dynamic vibrations in operating plants.
UL-Certified rigid type sway brace devices engineered for fire protection sprinkler systems and industrial utility headers. Designed to resist severe seismic acceleration and pipe sway without structural failure.
Pre-fabricated modular steel support frames and cable containment systems built under strict ABS Quality Evaluations ISO standards. Engineered for cleanroom ceilings, battery dry rooms, and data center server rows.
Stringent international certifications validating structural performance, safety management, and consistent quality standards.
Need complete test inspection reports or official certificate PDF copies for class submission?
Request Full Certificate DocumentationProtecting high-value assets and accelerating build-outs across key industrial sectors.
Zero fire spark hazard in live server halls. Quick-adjust modular racks for rapidly expanding fiber optic & busway systems.
Dust-free, cleanroom compliant ceiling grid channels and utility piping supports. Ideal for fast-track gigafactories in Georgia and Alabama.
Safe cold-work maintenance inside hazardous zones containing combustible gases, without requiring total facility shutdowns.
DNV-certified marine channels and anti-vibration smart fasteners resisting saltwater corrosion and constant engine vibrations.
Supplying certified welding-free support channels, fasteners, and tray systems to world-class EPCs and contractors across the US, South Korea, and offshore energy projects (2023โ2026).
| No. | Year | EPC or Contractor | Project | Application |
|---|---|---|---|---|
| 1 | 2026 | Hyundai E&C, Hyundai Steel ํ๋๊ฑด์ค, ํ๋์ ์ฒ |
Hyundai Steel Louisiana Plant
๐บ๐ธ US Mega-Plant (Louisiana)
|
๐ง Pipe Support (๋ฐฐ๊ด ์ง์ง๋) |
| 2 | 2025 | DLC, Hyundai E&C, Lotte E&C DL์ด์ค์จ, ํ๋๊ฑด์ค, ๋กฏ๋ฐ๊ฑด์ค |
S-Oil Shaheen
โก Petrochemical Megaproject (KRW 9T)
|
๐ข Raised Access Floor Support (์ด์ค๋ฐ๋ฅ ์ง์ง) |
| 3 | 2025 | DLC (Dae Lim Construction) DL์ด์ค์จ (๋๋ฆผ๊ฑด์ค) |
IENNOX (Lithium Hydroxide - LiOH)
๐ Secondary Battery Materials
|
๐ข Raised Access Floor, Cable L&T Support |
| 4 | 2024 | Samsung Heavy Industries ์ผ์ฑ์ค๊ณต์ |
CEDAR FLNG
๐ข Offshore Floating LNG Facility
|
๐ข Raised Access Floor Support (์ด์ค๋ฐ๋ฅ ์ง์ง) |
| 5 | 2024 | Samsung Heavy Industries ์ผ์ฑ์ค๊ณต์ |
P4 PH3 FAB B/D
๐ฌ Samsung Pyeongtaek Mega-Fab Ph.3
|
๐ง General Piping (์ผ๋ฐ ๋ฐฐ๊ด ์ง์ง๋) |
| 6 | 2024 | Samsung Heavy Industries ์ผ์ฑ์ค๊ณต์ |
P4 PH3 FAB B/D
๐ฌ Samsung Pyeongtaek Mega-Fab Ph.3
|
๐ง Wastewater Piping (์คํ์ ๋ฐฐ๊ด ์ง์ง๋) |
| 7 | 2024 | WESCO ๋ฏธ๊ตญ ๊ธ๋ก๋ฒ ์ข ํฉ ๊ณต๊ธ์ฌ WESCO |
MICRON, etc
๐บ๐ธ US Semiconductor Plant
|
โก Cable Tray Support (์ผ์ด๋ธ ํธ๋ ์ด ์ง์ง๋) |
| 8 | 2024 | AVALON WIRE ์๋ฐ๋ก ์์ด์ด |
NewYork warehouse, etc
๐บ๐ธ US Logistics & Distribution Center (NY)
|
โ๏ธ Wire Rope Drum Support (์์ด์ด ๋กํ ๋๋ผ) |
| 9 | 2024 | Samsung Electronics (Direct) ์ผ์ฑ์ ์ ์ง๋ฐ์ฃผ |
Office B/D Piping
๐ข Corporate Office Facility
|
๐ฅ Fire Fighting Piping Support (์๋ฐฉ ๋ฐฐ๊ด ์ง์ง) |
| 10 | 2024 | Samsung C&T ์ผ์ฑ๋ฌผ์ฐ ๊ฑด์ค๋ถ๋ฌธ |
P4 PH2 FAB
๐ฌ Samsung Pyeongtaek Mega-Fab Ph.2
|
๐ง General Piping Support (์ผ๋ฐ ๋ฐฐ๊ด ์ง์ง) |
| 11 | 2024 | Samsung E&A ์ผ์ฑE&A (๊ตฌ ์ผ์ฑ์์ง๋์ด๋ง) |
P4 PH2 Complex B/D
๐ฌ Samsung Pyeongtaek Complex Building
|
โก Cable Tray Support (์ผ์ด๋ธ ํธ๋ ์ด ์ง์ง) |
| 12 | 2024 | Samsung Heavy Industries ์ผ์ฑ์ค๊ณต์ |
P4 PH2 FAB
๐ฌ Samsung Pyeongtaek Mega-Fab Ph.2
|
๐จ Duct Support, etc (๊ณต์กฐ ๋ํธ ์ง์ง๋) |
| 13 | 2024 | AirFirst ์์ดํผ์คํธ (์ด๊ณ ์๋ ํน์๊ฐ์ค) |
P4 PH1 Gas Piping
๐ฌ Ultra-Pure Gas Piping Utility
|
๐จ Gas Piping Support (ํน์๊ฐ์ค ๋ฐฐ๊ด ์ง์ง) |
| 14 | 2023 | Samsung Heavy Industries ์ผ์ฑ์ค๊ณต์ |
P4 PH1 FAB
๐ฌ Samsung Pyeongtaek Mega-Fab Ph.1
|
๐จ Duct Support, etc (๊ณต์กฐ ๋ํธ ์ง์ง๋) |
| 15 | 2023 | Samsung Heavy Industries ์ผ์ฑ์ค๊ณต์ |
P4 PH1 FAB
๐ฌ Samsung Pyeongtaek Mega-Fab Ph.1
|
๐ง Wastewater Piping Support (์คํ์ ๋ฐฐ๊ด ์ง์ง) |
| 16 | 2023 | Samsung Heavy Industries ์ผ์ฑ์ค๊ณต์ |
P4 PH1 FAB Machine Room
๐ฌ Central Machine Room Utility
|
๐ง General Piping Support (Machine Room) |
Need detailed engineering project references, IFC submittal documentation, or load calculation sheets for your facility?